Materials and bill of quantities

Have you received a full and accurate copy of the bill of quantities for this project?

Construction of a block of 8 latrines — Institut Tumaini Jipya ·

Reported during the monitoring visit of 9 December 2025.

Verified

Resolved through Advocacy

Status Verified
4 daysSince the report
MediumSeverity
CategoryMaterials and bill of quantities

History

  1. Fixed

    · Monitor

  2. Verified

    · Monitor

  3. Reported

    · Monitor

  4. Proof of fix

    · Anonymous citizen

    Fix observed during the monitoring visit of 16 January 2026.

How the problem was fixed

A copy of the bill of quantities was handed to the Club and posted at the school.

Case study

Bill of quantities not shared: problem resolved at Institut Tumaini Jipya thanks to citizen monitoring

The Integrity Club reported on EduCheck: bill of quantities not shared. The problem was published and sent to the project management committee and the contractor.

Read the case study

Similar problems