Building sites followed
School construction projects followed by monitors, from building work to handover.
- infrastructures followed
- 32
- open problems
- 81
- resolution rate
- 31 %
32 projects
The map uses more mobile data. The list shows the same information.
- Open problems
- In progress
- All fixed
- No visit yet
Construction projectKinshasa
Rainwater harvesting tank — École primaire Tujenge
- Open
- 2
- Fixed
- 4
- Verified
- 0
Last visit: 31 May 2026
No response
Construction projectKinshasa
Rehabilitation of a school building — École primaire Les Collines
- Open
- 2
- Fixed
- 0
- Verified
- 1
Last visit: 27 March 2026
No response
Construction projectSud-Kivu
Rehabilitation of a school building — École primaire Espoir
- Open
- 1
- Fixed
- 1
- Verified
- 1
Last visit: 25 March 2026
No response
Construction project
Construction of a 3-classroom building at Institut UWEZO, Uvira
- Open
- 0
- Fixed
- 0
- Verified
- 0
No visit yet
Construction projectSud-Kivu
Installation of solar panels — Institut Sainte-Thérèse
- Open
- 0
- Fixed
- 0
- Verified
- 0
Last visit: 8 January 2026
Construction projectSud-Kivu
Construction of 6 classrooms at Institut Uvira
- Open
- 0
- Fixed
- 0
- Verified
- 0
No visit yet
Construction projectSud-Kivu
Access ramps for pupils with disabilities — École primaire Bondeko
- Open
- 0
- Fixed
- 0
- Verified
- 0
Last visit: 18 April 2026
Construction projectSud-Kivu
Computer room — Institut Kiwanja
- Open
- 0
- Fixed
- 0
- Verified
- 0
Last visit: 28 January 2026