Demonstration

Some of the schools, infrastructure projects, visits and problems shown are fictitious (EduCheck code DEMO-…); the figures shown include them.

Success story

Insufficient quantity of materials: problem resolved at École primaire Umoja thanks to citizen monitoring

Illustration : chantier

At École primaire Umoja (Mont-Amba, Kinshasa), the Integrity Club reported on EduCheck: insufficient quantity of materials. Within 174 days and through « Advocacy », the project fixed the problem; the monitors checked the fix on site.

The « Équipement d’une bibliothèque » project is meant to improve École primaire Umoja (Mont-Amba, Kinshasa). Student monitors of the school’s Integrity Club, trained by the Anti-Corruption Research Centre (CERC), follow the works with the EduCheck questionnaire to check that what was promised is delivered.

The problem

On 3 February 2026, the Integrity Club reported the following problem at École primaire Umoja: insufficient quantity of materials.

Materials that were paid for must reach the site: every diverted bag means a weaker building.

The problem was published on the school’s page and sent to the project management committee and the contractor.

The dialogue

The monitors opened a dialogue with the project management committee and the contractor:

  • Advocacy

The result

The fix was recorded on 27 July 2026, 174 days after the report.

During their visit on 11 October 2026, the monitors checked the fix on site: the problem moved to « Verified » on EduCheck.

This success shows what citizen monitoring makes possible: a problem made visible, a dialogue with the right people and a verified solution, for the benefit of pupils.

Your school can change too

Students, parents and teachers trained by CERC monitor their school and talk with those in charge until problems are fixed.

Become a monitor

More success stories