Construction quality
Is the project using materials of the correct type and quality?
Separate latrines for girls and boys — Institut Uzima ·
Reported during the monitoring visit of 11 December 2025.
Resolved through Advocacy
History
-
Fixed
The faulty materials were removed and replaced by materials matching the bill of quantities.
-
Reported
-
Proof of fix
Fix observed during the monitoring visit of 8 February 2026.
-
Verified (upcoming step)
How the problem was fixed
The faulty materials were removed and replaced by materials matching the bill of quantities.
Case study
Poor quality materials: problem fixed at Institut Uzima thanks to citizen monitoring
The Integrity Club reported on EduCheck: poor quality materials. The problem was published and sent to the project management committee and the contractor.