Construction quality

Is all construction work being performed to the correct standard? For example, are foundations or toilet pits being dug to the correct depth?

Library equipment — École primaire Umoja ·

Reported during the monitoring visit of 3 February 2026.

Verified

Resolved through Advocacy

Status Verified
0 daysSince the report
MediumSeverity
CategoryConstruction quality

History

  1. Fixed

    · Monitor

  2. Verified

    · Monitor

  3. Reported

    · Monitor

  4. Progress

    · Anonymous citizen

    Problem still observed on 5 May 2026.

  5. Proof of fix

    · Anonymous citizen

    Fix observed during the monitoring visit of 27 July 2026.

How the problem was fixed

The substandard works were redone under an engineer’s supervision.

Case study

Works not built to standard: problem resolved at École primaire Umoja thanks to citizen monitoring

The Integrity Club reported on EduCheck: works not built to standard. The problem was published and sent to the project management committee and the contractor.

Read the case study