Success story
Poor quality materials: problem fixed at Institut technique Le Progrès thanks to citizen monitoring
At Institut technique Le Progrès (Uvira, Sud-Kivu), the Integrity Club reported on EduCheck: poor quality materials. Within 122 days and through « Advocacy », the project fixed the problem.
The « Réhabilitation d’un bâtiment scolaire » project is meant to improve Institut technique Le Progrès (Uvira, Sud-Kivu). Student monitors of the school’s Integrity Club, trained by the Anti-Corruption Research Centre (CERC), follow the works with the EduCheck questionnaire to check that what was promised is delivered.
The problem
On 12 January 2026, the Integrity Club reported the following problem at Institut technique Le Progrès: poor quality materials.
A badly built structure endangers those who will use it and wastes public money.
The problem was published on the school’s page and sent to the project management committee and the contractor.
The dialogue
The monitors opened a dialogue with the project management committee and the contractor:
- Advocacy
The result
The fix was recorded on 14 May 2026, 122 days after the report.
The monitors will check the fix during their next visit; the problem will then move to « Verified ».
This success shows what citizen monitoring makes possible: a problem made visible, a dialogue with the right people and a verified solution, for the benefit of pupils.
Your school can change too
Students, parents and teachers trained by CERC monitor their school and talk with those in charge until problems are fixed.
More success stories
-
March 2026
Lessons given by unqualified teachers: problem resolved at École primaire Espoir thanks to citizen monitoring
-
March 2026
School timetable not displayed: problem resolved at Institut Furaha thanks to citizen monitoring
-
February 2026
Works stopped or delayed: problem resolved at Complexe scolaire Mapendo thanks to citizen monitoring