Insufficient quantity of materials: problem fixed at École primaire Tujenge thanks to citizen monitoring
At École primaire Tujenge (Mont-Amba, Kinshasa), the Integrity Club reported on EduCheck: insufficient quantity of materials. Within 92 days and through « Advocacy », the project fixed the problem.
The « Citerne de récupération d’eau de pluie » project is meant to improve École primaire Tujenge (Mont-Amba, Kinshasa). Student monitors of the school’s Integrity Club, trained by the Anti-Corruption Research Centre (CERC), follow the works with the EduCheck questionnaire to check that what was promised is delivered.
The problem
On 28 February 2026, the Integrity Club reported the following problem at École primaire Tujenge: insufficient quantity of materials.
Materials that were paid for must reach the site: every diverted bag means a weaker building.
The problem was published on the school’s page and sent to the project management committee and the contractor.
The dialogue
The monitors opened a dialogue with the project management committee and the contractor:
- Advocacy
The result
The fix was recorded on 31 May 2026, 92 days after the report.
The monitors will check the fix during their next visit; the problem will then move to « Verified ».
This success shows what citizen monitoring makes possible: a problem made visible, a dialogue with the right people and a verified solution, for the benefit of pupils.
Your school can change too
Students, parents and teachers trained by CERC monitor their school and talk with those in charge until problems are fixed.
More success stories
-
September 2026
Lack of clean water: problem resolved at Institut Kitumaini thanks to citizen monitoring
-
May 2026
Building not accessible to people living with disabilities: problem resolved at Institut La Victoire thanks to citizen monitoring
-
February 2026
Materials badly stored: problem resolved at Institut technique Le Progrès thanks to citizen monitoring