Success story
Construction site not fenced: problem fixed at Institut Tumaini Jipya thanks to citizen monitoring
At Institut Tumaini Jipya (Ibanda, Bukavu, Sud-Kivu), the Integrity Club reported on EduCheck: construction site not fenced. Within 38 days and through « Meeting with the school management », the project fixed the problem.
The « Construction d’un bloc de 8 latrines » project is meant to improve Institut Tumaini Jipya (Ibanda, Bukavu, Sud-Kivu). Student monitors of the school’s Integrity Club, trained by the Anti-Corruption Research Centre (CERC), follow the works with the EduCheck questionnaire to check that what was promised is delivered.
The problem
On 9 December 2025, the Integrity Club reported the following problem at Institut Tumaini Jipya: construction site not fenced.
An unsafe site puts both the workers and the children of the school nearby at risk.
The problem was published on the school’s page and sent to the project management committee and the contractor.
The dialogue
The monitors opened a dialogue with the project management committee and the contractor:
- Meeting with the school management
The result
The fix was recorded on 16 January 2026, 38 days after the report.
The monitors will check the fix during their next visit; the problem will then move to « Verified ».
This success shows what citizen monitoring makes possible: a problem made visible, a dialogue with the right people and a verified solution, for the benefit of pupils.
Your school can change too
Students, parents and teachers trained by CERC monitor their school and talk with those in charge until problems are fixed.
More success stories
-
March 2026
No attendance tracking of students: problem resolved at Institut Furaha thanks to citizen monitoring
-
February 2026
Furniture lacking or in poor condition: problem resolved at Institut technique Matumaini thanks to citizen monitoring
-
July 2026
Poor quality materials: problem resolved at École primaire Umoja thanks to citizen monitoring